routemap Oakland Jack London Square Terminal Alameda Main Street Terminal Alameda Harbor Bay Terminal South San Francisco Terminal AT&T Park Terminal SF Ferry Building Terminal SF Pier 41 Terminal Mare Island Terminal Vallejo Terminal

RFP 17-016: M/V Peralta

REQUEST for PROPOSALS

NOTICE IS HEREBY GIVEN THAT PROPOSALS will be received by the San Francisco Bay Area Water Emergency Transportation Authority (hereinafter “WETA”) at Pier 9, Suite 111, San Francisco, CA 94111, until 2:00 p.m. on November 8, 2017 for the following Project: M/V Peralta, RFP # 17-016. The Work consists of furnishing engineering, design services, materials, labor, tools, supplies, equipment, and transportation, necessary for refurbishment of vessel systems on the M/V Peralta as defined by drawings, specifications, and reference materials.

Key Dates (subject to change):

Mandatory Pre-Proposal Conference: 16 October 2017
Last Day to Submit Questions Regarding Contract Documents: 27 October 2017
RFP Proposal Due Date: 2:00 PM PST, 15 November 2017
Proposal Evaluation & Scoring: 16 November 2017
Notice of Intent to Award Issued: 3 December 2017
Contract Award: 13 December 2017
See additional dates in Instructions to Offerors, Appendix A, Contract Award Schedule and RFP addenda.

Download the RFP for M/V Peralta RFP #17-016

1 of 4:  Instructions to Offerors (56 pp PDF, 478 KB Download)
2 of 4:  Owners Requirements/Technical Specifications (61 pp PDF, 1.45 MB Download)
3 of 4:  General Provisions (71 pp PDF, 475 KB Download)
4 of 4:  Forms in PDF format (33 pp, 452 KB) or in Word (zipped) (283 KB)

Appendices to Owner's Requirements/Technical Specifications:
Appendix A (zipped, 42.7 MB)
Appendix B (zipped, 6.8 MB)
Appendix C (zipped, 97 KB)

Addendum 1: Includes Changes, Corrections, and updated technical specifications; Questions asked to date with responses. (8 pp PDF, 189 KB Download)
>> Attachments to Addendum 1 (includes Pre-proposal conference sign-in sheet and 13 additional files as referenced in Addendum 1, 17.6 MB zip file)

Addendum 2: Includes Changes and Corrections; Questions asked to date with responses. (6 pp PDF, 175 KB Download)
>> Attachments to Addendum 2 (includes files referenced in Addendum 2, 4.3 MB zip file)

Addendum 3: Includes Changes and Corrections. (2 pp PDF, 180 KB Download)
>> Attachments to Addendum 3 (includes files referenced in Addendum 3, 4.3 MB zip file)

Notice of Intent to Award: Peralta Mid-life Phase 2, NOI (1 p PDF)

Contact:

Tim Hanners, Engineering & Maintenance Administrator
(415) 364-1756
Pier 9, Suite 111, The Embarcadero
San Francisco, California 94111

--